WELLPROD™
Course 06 Construction

The Well Productivity ProgrammeWell Construction Impacts

Every metre of a well is built, and every construction choice leaves a mark on how it will produce. This course traces the productivity impact of drilling-fluid invasion, cementing, wellbore architecture, perforating and completion fluids, layer by layer from the bore outward.

5Modules
18Topics
PBLProblem-based
Self-pacedOnline delivery

Refined over 15 years of classroom delivery to national and international operators, now rebuilt as a problem-based, self-contained online programme for working petroleum engineers.

What you'll be able to do

Tell construction skin from reservoir skin

A surprising share of a well's skin is built into it. Course 06 trains you to recognise the damage each construction step can introduce, quantify it, and design the steps that protect productivity instead.

Account for invasion

Quantify filter-cake and filtrate damage with the Hawkins equation, and the role of LCM.

Trust the isolation

Read cement bond logs and the index of zonal isolation, and spot cement-induced damage.

Shape the completion

Account for geometric skin from architecture and deviation, and design perforations that bypass damage.

Finish clean

Design completion brines, filtration and clean-out to leave the wellbore productive.

Curriculum · 5 modules · 18 topics

Five construction steps that help or hurt productivity

From the mud that first touches the rock to the brine that leaves the hole clean: each module isolates one stage of well construction and the productivity it can win or lose.

25
Module 25

Drilling Fluid Invasion and the Damaged Zone

What the drilling fluid leaves behind: filter cake, filtrate invasion and the skin it creates.

  • T01Filter Cake and Filtrate Invasion
  • T02The Hawkins Equation
  • T03Lost Circulation Materials (LCM)
26
Module 26

Casing, Cementing, and Zonal Isolation

Sealing the well and keeping zones apart, and how cementing can help or harm productivity.

  • T01The Index of Zonal Isolation (IZI)
  • T02Cement Slurry Damage
  • T03Cement Bond Evaluation
27
Module 27

Wellbore Architecture and Geometric Skin Factors

How the shape of the completion (open or cased, partial, deviated) adds geometric skin.

  • T01Open Hole vs. Cased Hole Completions
  • T02Partial Completion Skin
  • T03Deviation Skin
28
Module 28

Perforating: Bridging the Wellbore and Reservoir

Reconnecting well to reservoir: punching past damage, the crushed zone and pressure regime.

  • T01Bypassing Drilling Damage
  • T02The Crushed Zone
  • T03Underbalanced vs. Overbalanced Perforating
29
Module 29

Completion Fluids and Wellbore Cleanliness

Finishing clean: brine design, filtration, compatibility and getting debris out of the hole.

  • T01Completion Fluid Design Selection
  • T02Completion Brines
  • T03Brine Filtration
  • T04Viscosifying Brine
  • T05Fluid Compatibility
  • T06Wellbore Clean Out

Who this course is for

  • Drilling, completion and production engineers linking construction choices to productivity.
  • Well-delivery teams weighing cementing, perforating and completion-fluid decisions.
  • Production engineers attributing skin to construction rather than reservoir causes.
  • Engineers continuing from Course 05 into construction-induced impairment.

What you leave with

  • The ability to quantify drilling-induced damage skin with the Hawkins equation.
  • A working grasp of zonal isolation and cement bond evaluation.
  • Confidence accounting for geometric skin from architecture, partial completion and deviation.
  • Perforating and completion-fluid logic that preserves rather than spends productivity.
How it's taught

Problem-based, not slide-based

Every module opens with a real well problem. You work the engineering, then the theory is introduced to explain what you found: the way the material was honed in the classroom over fifteen years.

01

Start with a well

Each topic is anchored to a field scenario with real data, not an abstract derivation.

02

Work the problem

You separate construction skin from reservoir skin and quantify it, then the theory frames why.

03

Carry it forward

The construction view here feeds the surveillance, diagnostics and remediation courses ahead.

Get started

Bring Well Construction Impacts to your team

Run Course 06 as a pilot for a cohort, or licence the full eleven-course programme. We'll tailor the rollout around your assets and engineering levels.